home *** CD-ROM | disk | FTP | other *** search
/ PC Electronic Plus / PC Electronics Plus (Most Significant Bits)(1995).ISO / pma / btest1.gif < prev    next >
Graphics Interchange Format  |  1994-09-08  |  11KB  |  640x480  |  4-bit (6 colors)
Labels: text | electronics | screenshot | display | font | software
OCR: BURGER Thermally Test Your Tower We established in the section covering Design Conditions that water volume, CWT, HWT, and WBT are constantly changing in a typical cooling tower. The question is, how do we test the tower to see if it is producing the level of performance promised by its supplier ? You have three options: 1. Call the Midwest Research Institute ( 816 / 753 - 7600 ) for testing as per Cooling Tower Institute Acceptance Code ATC - 105. NOTE: The CTI test is a performance test only listing percentage of capability. It does not identify the causes of deficiencies. 1 Continue 2 Previous 0 Main Menu